Gaofei
  • Home
  • Tunnel lining formwork
    • Single-track railway lining trolley
    • Double-track railway lining trolley
    • Two-lane highway lining trolley
    • Three-lane highway lining trolley
    • Pipeline municipal lining trolley
    • Water conservancy and hydropower lining trolley
    • Subway lining trolley
  • Products
    • Hydraulic inverting bridge formwork
    • Tunnel waterproof board laying formwork
    • Tunnel formwork bypass channel
    • Tunnel concrete maintenance formwork
    • Tunnel equipment accessories
    • Tunnel lining trolley accessories
  • About us
    • Company culture
    • Production cycle
    • Company achievements
  • Blog
  • Contact us
  • Search
  • Menu
  • Mail
  • Twitter
  • Linkedin
  • Tumblr
  • Facebook
You are here: Home / Tunnel lining formwork / Pipeline municipal lining trolley
  • Tunnel lining formwork

    CUSTOM-RANGE

Pipeline municipal lining trolley

Pipeline municipal lining trolley

Pipeline municipal lining trolley

Pipeline municipal lining trolley

Pipeline municipal lining trolley

Pipeline municipal lining trolley

Pipeline municipal lining trolley

Pipeline municipal lining trolley

Pipeline municipal lining trolley

Pipeline municipal lining trolley

Page 1 of 212
Design specifications3 meters, 6 meters, 9 meters, 10 meters, 12 meters
Design weight 20 tons – 150 tons / set
ModelFully automatic hydraulic self-propelled
StructureDoor hole type

Pipeline municipal lining trolley advantages

1.Short construction period

Compared with the traditional bakelite formwork and the aluminum alloy formwork, the mold is removed, the walking and the supporting form are only used for one day, the roof steel bar is tied and poured for one day, and the maintenance is carried out for three days. The normal construction can reach the standard section of a pipe gallery for five days.

2.Saving labor

Pipeline municipal lining trolley construction method is replaced by manual mechanization instead of manual removal and assembly. The standard bakelite mold and aluminum alloy formwork require 40 workers for formwork and shelf work. Only 10 of them are used. Workers, labor costs are reduced by 75%.

3.The labor intensity of workers is greatly reduced and the safety is higher

Pipeline municipal lining trolley is automatically driven by the hydraulic dismantling mold. Workers only need to screw the bolts, and the labor intensity is reduced by 80%. The aging of construction workers has changed the way young people are unwilling to engage in the construction industry because of the “dirty, tired, poor working environment” of the construction industry.

4.Comprehensive benefits are obvious

Pipeline municipal lining trolley adopts the overall large steel mold, the outer mold is hoisted as a whole, and no external scaffolding is needed. It can reduce the width of the excavation section, reduce a large number of excavation and backfilling earthwork, and save the cost of erecting external scaffolding. The benefit is very obvious.

Share this item
  • Share on Facebook
  • Share on Twitter
  • Share on Linkedin
  • Share on Tumblr
  • Share by Mail

Search

Products

  • Tunnel waterproof board laying formwork
  • Hydraulic inverting bridge formwork
    • Wheeled Hydraulic inverting bridge formwork
    • Crawler Hydraulic inverting bridge formwork
  • Tunnel formwork bypass channel
  • Tunnel concrete maintenance formwork
  • Tunnel equipment accessories
    • Walking system
    • Hydraulic system
    • Hydraulic cylinder
    • Formwork support rod
    • Electric motor
    • Worm gear reducer
  • Tunnel lining trolley accessories
    • Lining trolley plug steel template
    • Tunnel lining concrete grouting device
    • Betonierwagen
    • Secondary grouting machine

Tunnel lining formwork

  • Single-track railway lining trolley
  • Double-track railway lining trolley
  • Two-lane highway lining trolley
  • Three-lane highway lining trolley
  • Pipeline municipal lining trolley
  • Water conservancy and hydropower lining trolley
  • Subway lining trolley

CONTACT US

Luoyang Gaofei Bridge Tunnel Machinery Co., Ltd.
Address: Xiagou Industrial Park, Xigong District, Luoyang City
Tel: 0379-60851761
Contact: Huang Gaofei
Mobile: +86-18637923976 /
Phone:0379-80881719  / 0379-60162687
QQ: 286827457
E-mail: lygfqsjx@126.com

Opening Hours

Mon-Fri: 9:00-20:00
Sat/Sun: 9:00-18:00

Corporate values

Loyalty, dedication, dedication

Contact us

Address: 200m east of tulip garden, group 12 of zhangling community, hongshan street office, hongshan town, xigong district, Luoyang

Mobile: +86-18637923976 /

E-mail: lygfqsjx@126.com

Search

If you have any questions or purchase intentions, please feel free to contact us.

Copyright © 2019 Gaofei group ALL RIGHTS RESERVED. TECHNICAL SUPPORT:Shangxian - ShangXian
  • Mail
  • Twitter
  • Linkedin
  • Tumblr
  • Facebook
Scroll to top